Guides

Guides: the answers before the sales pitch

Six things people ask us before they ask for a price. Written to be useful whether or not you ever call us.

One slab carried across the whole peninsula so the vein does not break
Quartz vs granite

Quartz vs granite: which one wins, kitchen by kitchen

Quartz vs granite compared on heat, sealing, seams, chips and price, with a clear winner named for seven real kitchens instead of a shrug and it depends.

Read it
Quartz vs quartzite

Quartz vs quartzite: same first six letters, different products

Quartz vs quartzite explained: one is made in a press, one is quarried. Heat, sealing, price, and the two tests that catch a slab labeled quartzite wrongly.

Read it
Choosing a material

How to choose countertop material: five questions that settle it

Five questions that settle which countertop material you should buy, a comparison table of seven surfaces, and a named pick for eight kinds of household.

Read it
Countertop seams

Countertop seams: where they have to go, and what a good one looks like

Where countertop seams have to go, what a good one looks like at counter height, what makes one bad, what you can demand, and what is physically impossible.

Read it
Countertop cost

Countertop cost per square foot: the published ranges, and what moves them in Seattle

Published national countertop ranges from Angi and HomeAdvisor, why Seattle sits above them, slab-only versus installed, and how to compare three quotes.

Read it
Bathroom remodel cost

Bathroom remodel cost Washington State: what the money actually buys

What a bathroom remodel costs in Washington: labor rates, sales tax on labor, permits, why Eastside bids run high, and the season when quotes come down.

Read it

Next step

Tell us about the kitchen.

Leave a number and Mike calls you back. After you meet, your written itemized price arrives the same day.

  • The seamFlat to the touch, or we redo it before we leave.
  • The priceWhat is on your bid is what is on your invoice.
  • The warrantyOne year on our workmanship from the day we install, on one page handed to you at the measure.
  • Your slabThe stone itself is covered by the manufacturer's own warranty. That document goes to you on install day.
  • A year laterWe come back, test the sealer and redo it if it needs it. No call-out fee.

Free estimate

Six lines, and Mike calls you back.

Mike calls from (206) 643-9354. No offers by text, and your number does not go anywhere else.

He calls back the same business day.

No spam, no drip emails, no showroom appointment required. If it is not a job for us, Mike tells you straight.